IC77 ENGINEERING INSURANCE EXAM - 10

 25
Q1.Cold testing means
   a) Commissioning of parts
  b) Testing under no-load condition
  c) No-load testing permitting Indirect heat or feedstock usage
   d) Testing for attaining specification requirement
 
Q2.Under project insurance, which cover we can offer to the client on a first loss basis?
   a) Mechanical breakdown
   b) Faulty workmanship
   c) Earthquake
   d) Theft and burglary
 
Q3.What are common features of the Engineering Insurance Policies and they are specifically mentioned in the policy schedules as applicable for different perils or different properties?
   a) Time excess
   b) Deductibles
   c) Consideration
   d) Endorsements
 
Q4.Contractors all risk insurance forms part of
   a) Personal general insurance
   b) Commercial general insurance
   c) Group insurance
   d) Social security insurance
 
Q5.Which of the following is an optional cover under IAR policy
   a) FLOP
   b) Machinery Breakdown
   c) EEI
   d) None of the above
 
Q6.Which policies are intended for contractors who normally undertake construction works of similar nature in sufficiently large numbers?
   a) Construction Annual policies
   b) Contractor's plant and Machinery Insurance policy
   c) Machinery leasing insurance policy
   d) None of the above
 
Q7.Which of the following is not covered in MBD policy.
   a) Tearing apart on account of centrifugal force.
   b) Short circuit followed by fire.
  c) Fire followed by the short circuit.
   d) All are covered.
 
Q8.CAR policy can be issued where civil work in a project is more than
   a) 60%
   b) 50%
   c) 40%
   d) 25%
 
Q9.Estimated maximum loss/PML is the concept used
   a) in fire Insurance only
   b) in Engineering Insurance only
   c) in ALOP policy
   d) as a tool of risk management
 
Q10.Sum Insured under EAR Policy should be
   a) Reinstatement value
   b) Completely Erected value of the project.
   c) Market value
   d) None

Click Here for Answer Key