IC77 ENGINEERING INSURANCE EXAM - 02
Q1.Which of the following policy normally cover Lift Cranes, Material handling plant and equipment in the construction and project sites |
a) Contractor Plant and; Machinery |
b) Contractor All Risk |
c) Marine cum erection Policy |
d) Erection All Risk |
Q2.Which of the following is true regarding MBD policy: |
a) Minimum premium is Rs250. |
b) Premium rates can be rounded off. |
c) Short-period policies are not permitted. |
d) Refund of premium for lockout period is not permitted. |
Q3.Stand by machinery in MBD is |
a) not covered |
b) covered at a discount of 50% in rate |
c) discount of 75% |
d) only covered when it is put to use |
Q4.Under Section 3, The increased cost of working the insured need to select the limits in respect of which of the following? |
a) Indemnity per hour |
b) Expenses on transportation of materials. |
c) Aggregate indemnity limit during the period of insurance |
d) All of the above |
Q5.The ____ is a stamped document that provides evidence of the insurance contract, and therefore it must be carefully drafted and issued in the appropriate forum. |
a) Certificate |
b) Policy |
c) Diagram |
d) None of the above |
Q6.Which is the checking of parts and elements of insured property by mechanical, hydrostatic, or other forms of testing under 'no load' conditions? |
a) Hot testing |
b) Cold testing |
Q7.What shall mean the sudden and dangerous distortion of any part of a boiler or pressure plant by bending or crushing caused by steam, gas, or fluid pressure whether attended by rupture or not? |
a) Boiler |
b) Pressure plant |
c) Collapse |
d) Chemical explosion |
Q8.Which of the following statement is true |
a) Storage and; construction claims |
b) Maintenance period |
c) Major perils claims |
d) All the above |
Q9.What is the minimum policy period for DOS Policy |
a) 3 MONTHS |
b) 5 MONTHS |
c) 7 MONTHS |
d) 12 MONTHS |
Q10.The adjustment of the sum insured in EAR policy is not done in respect of |
a) freight and handling charges |
b) custom duties |
c) cost of erection |
d) increase or decrease in prime cost of plant and machinery |